Catalogue overview
Four streams,
one Kyiv warehouse.
The list below is a navigation index. Stock levels, lead times and pricing are confirmed on request — submit the catalogue form on the home page and a FILTO representative will send the appropriate sheet for your industry.
Industrial Machinery
Production-line equipment held under KVED 46.14 (intermediated machinery trade) and KVED 46.90 (non-specialised wholesale). FILTO does not manufacture; we source, warehouse and resell on written specification.
-
FLT-MACH-01
Modular conveyor segment
Steel frame · belt width 600 mm · segment length 3 m · multi-unit assembly
Lead time: confirmed on request
-
FLT-MACH-02
Hydraulic press unit
Workbench class · operator-side controls · CE-marked optional
Lead time: confirmed on request
-
FLT-MACH-03
Stationary mixing tank
Stainless steel · 1000 L nominal · top-mounted agitator option
Lead time: confirmed on request
-
FLT-MACH-04
Pneumatic packaging head
Compact footprint · integrates into existing line · documented airflow
Lead time: confirmed on request
Spare Parts
FILTO holds a working spare-parts inventory for the machinery families above at the Kyiv warehouse. Catalogue numbers below are placeholder identifiers; the sheet for your industry lists matched OE references.
-
FLT-PART-11
Conveyor drive roller
Plain bearing · multiple bore sizes · replacement for FLT-MACH-01 family
Stock: typically held in Kyiv
-
FLT-PART-12
Hydraulic seal kit
NBR / FPM variants · packaged per machine generation
Stock: typically held in Kyiv
-
FLT-PART-13
Agitator blade assembly
For 1000 L tank class · stainless · keyed shaft fitment
Stock: confirmed on request
-
FLT-PART-14
Pneumatic head solenoid set
24V DC and 230V AC variants · with reference connectors
Stock: typically held in Kyiv
Installation Services
Scope of work under KVED 33.20. FILTO crews mobilise from the Kyiv warehouse and operate under written acceptance protocols agreed before site arrival.
-
FLT-INST-21
Single-line installation
Equipment placed and levelled, utilities terminated, dry-run verification
Duration: scoped per site survey
-
FLT-INST-22
Multi-line commissioning
Interlocked installation across upstream/downstream stations, operator handover
Duration: scoped per site survey
-
FLT-INST-23
Relocation & reinstallation
Equipment removal, transport in original packaging, reinstallation at new site
Duration: scoped per site survey
Technical Consulting
Engineering and technical advisory work under KVED 71.12. Delivered as a fixed-scope written deliverable, not a retainer.
-
FLT-ADV-31
Pre-procurement review
Specification check, vendor shortlist, written recommendation
Output: signed report
-
FLT-ADV-32
Capacity planning brief
Throughput modelling, bottleneck identification, capital options
Output: signed report
-
FLT-ADV-33
Repair scheduling brief
Maintenance windows, parts list under KVED 33.12, owner sign-off
Output: signed report
The catalogue is supplied as a written PDF specific to your industry.
Request the catalogue